{"id":29671,"date":"2020-07-10T16:30:00","date_gmt":"2020-07-10T20:30:00","guid":{"rendered":"https:\/\/www.westbendnews.net\/autonews\/?p=29671"},"modified":"2020-07-07T09:50:58","modified_gmt":"2020-07-07T13:50:58","slug":"paulding-putnam-electric-rebuilds-cecil-substation-for-improved-reliability","status":"publish","type":"post","link":"https:\/\/www.westbendnews.net\/autonews\/paulding-putnam-electric-rebuilds-cecil-substation-for-improved-reliability\/","title":{"rendered":"Paulding Putnam Electric Rebuilds Cecil Substation for Improved Reliability"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" decoding=\"async\" width=\"800\" height=\"600\" loading=\"lazy\" src=\"https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2020\/07\/Cecil-Substation_PPEC.jpg?resize=800%2C600&#038;ssl=1\" alt=\"\" class=\"wp-image-29672\" srcset=\"https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2020\/07\/Cecil-Substation_PPEC.jpg?w=1016&amp;ssl=1 1016w, https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2020\/07\/Cecil-Substation_PPEC.jpg?resize=768%2C576&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2020\/07\/Cecil-Substation_PPEC.jpg?resize=560%2C420&amp;ssl=1 560w, https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2020\/07\/Cecil-Substation_PPEC.jpg?resize=260%2C195&amp;ssl=1 260w, https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2020\/07\/Cecil-Substation_PPEC.jpg?resize=160%2C120&amp;ssl=1 160w, https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2020\/07\/Cecil-Substation_PPEC.jpg?resize=400%2C300&amp;ssl=1 400w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<p>Paulding Putnam Electric Cooperative recently started a $2.1 million project to rebuild and upgrade the co-op\u2019s Cecil Substation, which will improve electric reliability, reduce outages, and increase future electric load capacity for businesses in the Paulding, Ohio, area. Construction started in June and is expected to be completed by mid-November 2020.<\/p>\n\n\n\n<p>Residents living in the Paulding and surrounding areas won\u2019t experience an impact to their current service. PPEC\u2019s previous work plans and strategic outlook over the last 10 years has given the co-op the capability to \u201cbackfeed,\u201d using power from other substations to supply the homes and businesses normally served by the Cecil Substation during the rebuild process.<\/p>\n\n\n\n<p>PPEC has partnered with Eaton Corporation Group to complete the substation rebuild. The new Cecil Substation will be equipped with a 12 MVA station transformer, which is more than twice the capacity of the old 5 MVA transformer. The project will also include other upgraded features to the substation, including new high side protection, a new control house, and a new circuit breaker. Security cameras will be present as well.<\/p>\n\n\n\n<p>\u201cWe\u2019re excited for the many businesses in Paulding County that will benefit from this large upgrade,\u201d said Steve Kahle, PPEC Engineering Manager. \u201cRebuilding the Cecil Substation will take about six months but will be well worth it. The new substation will improve reliability, system durability, and increase load capacity for future growth in our community. If more business comes or a company wants to expand, we want to be able to offer that capability.\u201d<\/p>\n\n\n\n<p>For more information, call PPEC\u2019s office at 800-686-2357 Monday through Friday from 7:30 am to 4 pm.<\/p>\n\n\n\n<p>Paulding Putnam Electric Cooperative is proud to serve more than 12,900 members in Paulding, Putnam, Defiance, Van Wert, and Allen counties in Ohio, and Adams and Allen counties in Indiana. Since 1935, our not-for-profit model has allowed us to provide affordable, reliable, and safe power to rural areas with pride.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Paulding Putnam Electric Cooperative recently started a $2.1 million project to rebuild and upgrade the co-op\u2019s Cecil Substation, which will<\/p>\n","protected":false},"author":3,"featured_media":29672,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","nf_dc_page":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[6],"tags":[],"class_list":["post-29671","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-community"],"aioseo_notices":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2020\/07\/Cecil-Substation_PPEC.jpg?fit=1016%2C762&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2YQd9-7Iz","jetpack-related-posts":[],"jetpack_likes_enabled":true,"publishpress_future_action":{"enabled":false,"date":"2026-04-28 04:45:39","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/posts\/29671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/comments?post=29671"}],"version-history":[{"count":0,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/posts\/29671\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/media\/29672"}],"wp:attachment":[{"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/media?parent=29671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/categories?post=29671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/tags?post=29671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}