{"id":1826,"date":"2013-03-27T15:43:07","date_gmt":"2013-03-27T19:43:07","guid":{"rendered":"http:\/\/www.westbendnews.net\/autonews\/?p=1826"},"modified":"2013-03-27T14:10:11","modified_gmt":"2013-03-27T18:10:11","slug":"pch-phase-1-of-er-renovation-complete","status":"publish","type":"post","link":"https:\/\/www.westbendnews.net\/autonews\/pch-phase-1-of-er-renovation-complete\/","title":{"rendered":"PCH: Phase 1 of ER Renovation Complete"},"content":{"rendered":"<p>&nbsp;<\/p>\n<figure id=\"attachment_1827\" aria-describedby=\"caption-attachment-1827\" style=\"width: 666px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2013\/03\/New-ER.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-1827\" alt=\"Construction workers put the final touches on the U- shaped nurse\u2019s station in the new  emergency room. PCH will begin seeing patients in the new ER at noon on Fri. March 29th.\" src=\"https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2013\/03\/New-ER.jpg?resize=666%2C500\" width=\"666\" height=\"500\" srcset=\"https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2013\/03\/New-ER.jpg?w=666&amp;ssl=1 666w, https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2013\/03\/New-ER.jpg?resize=300%2C225&amp;ssl=1 300w\" sizes=\"auto, (max-width: 666px) 100vw, 666px\" \/><\/a><figcaption id=\"caption-attachment-1827\" class=\"wp-caption-text\">Construction workers put the final touches on the U- shaped nurse\u2019s station in the new emergency room. PCH will begin seeing patients in the new ER at noon on Fri. March 29th.<\/figcaption><\/figure>\n<p>The first of three phases of ER\/Lab renovations has been completed.\u00a0 On March 29th at Noon, patients can once again enter the Paulding County Hospital Emergency Room at the original locations.\u00a0 You can either drive up to the ER entrance at the rear of the hospital or you can walk up to the ER registration window in the main outpatient lobby.\u00a0 At this point, five new ER rooms have been completed along with a u-shaped nurse\u2019s station that has direct line of sight to all patient rooms.<\/p>\n<p>See the Walkthru of the nearly finished section here:<\/p>\n<div class=\"jetpack-video-wrapper\"><span class=\"embed-youtube\" style=\"text-align:center; display: block;\"><iframe loading=\"lazy\" class=\"youtube-player\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/42-d91TeSWc?version=3&#038;rel=1&#038;showsearch=0&#038;showinfo=1&#038;iv_load_policy=1&#038;fs=1&#038;hl=en-US&#038;autohide=2&#038;wmode=transparent\" allowfullscreen=\"true\" style=\"border:0;\" sandbox=\"allow-scripts allow-same-origin allow-popups allow-presentation allow-popups-to-escape-sandbox\"><\/iframe><\/span><\/div>\n<p>The next phase will include renovations to the east wing of the hospital to move the laboratory there permanently.\u00a0 Once the testing lab moves to the east wing, phase three will begin to add two large trauma rooms to the ER.\u00a0 The projected completion date for this project should be in the summer of 2013.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; The first of three phases of ER\/Lab renovations has been completed.\u00a0 On March 29th at Noon, patients can once<\/p>\n","protected":false},"author":3,"featured_media":1827,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","nf_dc_page":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[6],"tags":[666,663,614,665,664],"class_list":["post-1826","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-community","tag-complete","tag-er","tag-pch","tag-phase1","tag-renovation"],"aioseo_notices":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.westbendnews.net\/autonews\/wp-content\/uploads\/2013\/03\/New-ER.jpg?fit=666%2C500&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p2YQd9-ts","jetpack-related-posts":[],"jetpack_likes_enabled":true,"publishpress_future_action":{"enabled":false,"date":"2026-04-29 08:42:52","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/posts\/1826","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/comments?post=1826"}],"version-history":[{"count":0,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/posts\/1826\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/media\/1827"}],"wp:attachment":[{"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/media?parent=1826"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/categories?post=1826"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.westbendnews.net\/autonews\/wp-json\/wp\/v2\/tags?post=1826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}